Task group 2 (part b) + verification of elevation-profile-hardening. compute-days.ts no longer sums every raw point-to-point delta for cumulative ascent/descent (which overstated day totals the same 20–50%). It now despikes each segment, runs cumulativeFilteredTotals once over the despiked track, and maps the running filtered ascent/descent back onto the flat allPoints indices (carrying forward across ele-less points). Day totals = cumulative[end] − cumulative[start] therefore match the filtered route total by construction. DayStage shape + rounding unchanged. Test: a two-day split over the shared noisy/spiky track reports filtered (not inflated) per-day ascent, and the day ascents sum exactly to the whole-route filtered ascent. Completes the change (11/11). Verified: gpx 112/112; full pnpm typecheck 13/13, lint 13/13, test 11/11 (journal + planner compile unchanged). Co-Authored-By: Claude Opus 4.8 (1M context) <noreply@anthropic.com> |
||
|---|---|---|
| .. | ||
| api | ||
| db | ||
| fit | ||
| gpx | ||
| i18n | ||
| jobs | ||
| map-core | ||
| sentry-config | ||
| types | ||